Hi,
I have a Jura Z10. Between 8:00 AM and 6:00 PM, the machine produces 4 to 10 drinks, and the time between drinks is 1 to 4 hours.
The default automatic time off was set to 30 minutes. This means that the machine goes through a start time and shutdown rinse each time a drink is made (so 4 to...